Pilbara Regional Water Infrastructure Upgrade

Client

WA Water Corporation

Location

Karratha, WA

Value

$42M

completed

Client

WA Water Corporation

Location

Karratha, WA

Contract Value

$42M

Duration

14 months

Completed

March 2024

Team Size

92 peak (FIFO)

End-to-end civil delivery of a regional water supply network upgrade servicing Karratha and surrounding communities, including 28 km of new trunk main and pump station upgrades.

Certifications

ISO 9001ISO 14001ISO 45001

The Challenge

Delivering critical water infrastructure in one of Australia's most remote and climatically extreme regions - sustained temperatures above 48°C, cyclone season constraints, and a workforce that required FIFO rotation from Perth every two weeks.

Our Solution

Le Gardenz established a Karratha operational hub 6 months before mobilisation, pre-positioning plant and materials to de-risk the programme. All paving and concrete pours were scheduled to night shifts to meet specification tolerances. A 14-day FIFO roster was implemented for the 92-person peak workforce.

Scope of Works

01

28 km DN600 HDPE trunk main installation

02

4 pump station upgrades including new VSD drives

03

Civil earthworks - 480,000 m³ cut/fill

04

Access road construction - 14 km

05

Erosion and sediment control across 6 work fronts

06

Reinstatement of all disturbed areas

Outcomes

  • -

    28 km of DN600 trunk main installed and pressure tested

  • -

    4 pump stations upgraded to remotely monitored, variable-speed configuration

  • -

    Programme delivered 3 weeks ahead of contracted milestone

  • -

    Zero lost-time injuries across 220,000 worked hours

  • -

    All paving works completed within material temperature specification